Machine Pre-Start Inspection

Section 1 — Site Information

Section 2 — Operator Details

Section 3 — Machine Details

Section 4 — Fluids Check

Section 5 — Machine Condition

Section 6 — Safety Equipment

Section 7 — Visibility

Section 8 — Operator Safety

Section 9 — Defects / Comments

Leave blank if there are no issues.0/2000

Section 10 — Operator Declaration

Draw signature

Sign with your finger or stylus. This is stored with the inspection record and added to the PDF.

Record saves to Supabase and emails the PDF from reports@onlydiggers.com.au.